|
Welcome to the NEW RLFANS.COM. After twenty-five years of service, the old site expired over the last few days. To maintain service we have had no option but to make an early switch to the new site which was in development/testing. Some elements of the new site are unfinished, such as; page numbering and quotations. We will fix these minor issues as soon as we can, please bear with us. If you are having problems logging in, please try a different browser or platform, if problems persist then email support@rlfans.com
 |
|
 |
Rank | Posts | Team |
Player Coach | 25 | No Team Selected |
Joined | Service | Reputation |
Aug 2010 | 15 years | |
Online | Last Post | Last Page |
Nov 2011 | Nov 2011 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
| Depends really what time you need to be in work for and where abouts in the City centre it is?
I used to travel from Birchwood to the Palace Hotel on Oxford Road 5 days a week by car, leaving between 7am and 7.15am meant I would be in work for between 7.45 and 8.15am. If Man U are at home during the week it could be a nightmare trying to get back to the M602 to get home so for your sake let's hope they get knocked out of the Champions League soon!!
I'm not really a morning person so the fact I didn't have to acknowledge people meant that the car was always my prefered option!
| | |
Rank | Posts | Team |
International Chairman | 4712 | No Team Selected |
Joined | Service | Reputation |
Feb 2002 | 23 years | |
Online | Last Post | Last Page |
May 2021 | May 2021 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
|
Quote Thank you for your feedback regarding your journey through J11 on the M62 on the 3rd of February.
The ramp metering (traffic lights on the slip road) at J11 on the M62 have been switched off for some time due to several faults. The site was re-commissioned on Monday the 24th and put back into service and has been carefully monitored for correct operation since.
I am sorry you experienced delay to your journey. Although we have experienced high volumes of traffic during the week beginning Monday the 24th that have caused problems in this area, Our ability to count vehicles travelling across the stop line shows the ramp metering system has not reduced the number of vehicles travelling down the slip road onto the main carriage way.
However, we have made some fine tuning adjustments to the site in order to optimise it performance. We are continuing to monitor the sites performance and the traffic patterns it experiences in order to best manage the converging traffic flows. From other sites we know it can take up to two weeks for the system and road users to adjust, which can lead to some additional congestion, and adjustment if necessary.
Briefly the ramp metering system works by trying to break up the joining slip road traffic into small groups. This is done to minimise the disruption merging traffic causes to the main carriage way and to help speed up the recovery time when the main carriage way traffic is brought to a stand still.
This is balanced against traffic building up on roads adjacent to the motorway and queuing on the slip road, releasing lager blocks on to the main carriage way to over come this.
If overall traffic volumes in the area exceed the capacity of the main carriage way traffic will eventually come a stand still. This will cause traffic to queue up on the slip road and adjacent local roads. However as the main carriage way starts to flow again ramp metering will greatly reduce the time it takes to recover.
We do regularly monitor all our ramp metering sites and will continue to do so as traffic flows in the area fluctuate over the next few weeks. Please be assured that we will not allow the system to cause unnecessary delays and that we take every available option to reduce delays to road users.
I am happy to discuss further, either by email or telephone, which is most convenient for you and would value your continued feedback about this site.
Regards
Russell Pinchen
Highways Agency | Temple Quay House | 2 The Square, Temple Quay | Bristol | BS1 6HA
Tel: +44 (0) 117 3726039 | Fax: + 44 (0) 117 3728447 | Mobile: + 44 (0) 7787 891 039
Web: www.highways.gov.uk
GTN: 1371 6039 '"
|
|
Quote Thank you for your feedback regarding your journey through J11 on the M62 on the 3rd of February.
The ramp metering (traffic lights on the slip road) at J11 on the M62 have been switched off for some time due to several faults. The site was re-commissioned on Monday the 24th and put back into service and has been carefully monitored for correct operation since.
I am sorry you experienced delay to your journey. Although we have experienced high volumes of traffic during the week beginning Monday the 24th that have caused problems in this area, Our ability to count vehicles travelling across the stop line shows the ramp metering system has not reduced the number of vehicles travelling down the slip road onto the main carriage way.
However, we have made some fine tuning adjustments to the site in order to optimise it performance. We are continuing to monitor the sites performance and the traffic patterns it experiences in order to best manage the converging traffic flows. From other sites we know it can take up to two weeks for the system and road users to adjust, which can lead to some additional congestion, and adjustment if necessary.
Briefly the ramp metering system works by trying to break up the joining slip road traffic into small groups. This is done to minimise the disruption merging traffic causes to the main carriage way and to help speed up the recovery time when the main carriage way traffic is brought to a stand still.
This is balanced against traffic building up on roads adjacent to the motorway and queuing on the slip road, releasing lager blocks on to the main carriage way to over come this.
If overall traffic volumes in the area exceed the capacity of the main carriage way traffic will eventually come a stand still. This will cause traffic to queue up on the slip road and adjacent local roads. However as the main carriage way starts to flow again ramp metering will greatly reduce the time it takes to recover.
We do regularly monitor all our ramp metering sites and will continue to do so as traffic flows in the area fluctuate over the next few weeks. Please be assured that we will not allow the system to cause unnecessary delays and that we take every available option to reduce delays to road users.
I am happy to discuss further, either by email or telephone, which is most convenient for you and would value your continued feedback about this site.
Regards
Russell Pinchen
Highways Agency | Temple Quay House | 2 The Square, Temple Quay | Bristol | BS1 6HA
Tel: +44 (0) 117 3726039 | Fax: + 44 (0) 117 3728447 | Mobile: + 44 (0) 7787 891 039
Web: www.highways.gov.uk
GTN: 1371 6039 '"
|
|
| | | |
Rank | Posts | Team |
Player Coach | 14289 | No Team Selected |
Joined | Service | Reputation |
Jun 2006 | 19 years | |
Online | Last Post | Last Page |
Feb 2025 | Feb 2025 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
| I've given up on cars now. Big motorbikes are the way forward, just weave in and out of traffic like it isn't there. Even DSA approve of filtering. Plus road tax is much cheaper and my 130bhp Triumph gives me all the performance I'll ever need for < £8k. 
| | |
Rank | Posts | Team |
Player Coach | 3001 | No Team Selected |
Joined | Service | Reputation |
Mar 2009 | 16 years | |
Online | Last Post | Last Page |
Feb 2025 | Feb 2025 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
| Am landscaping the subways and underpasses, just at the end of M602.
| | |
Rank | Posts | Team |
Player Coach | 2972 | No Team Selected |
Joined | Service | Reputation |
Nov 2005 | 19 years | |
Online | Last Post | Last Page |
Jun 2023 | Jun 2023 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
| Quote Wirefan="Wirefan"Quote Wirefan
This is balanced against traffic building up on roads adjacent to the motorway and queuing on the slip road, releasing=#FF0000[size=150 lager blocks[/size on to the main carriage way to over come this.
'" '"
Legendary typo 
| | | |
Rank | Posts | Team |
Player Coach | 2795 | No Team Selected |
Joined | Service | Reputation |
Jul 2009 | 16 years | |
Online | Last Post | Last Page |
Jan 2022 | Dec 2020 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
| you wanna try the east lancs (a580) in the morning! luckily for me i'm traveling out of manchester, the joys of night shifts, but some mornings it's backed up to the greyhound pub going into manchester at 0830am!
| | |
 | |
All views expressed are those of the author and not necessarily those of the RLFANS.COM or its subsites.
Whilst every effort is made to ensure that news stories, articles and images are correct, we cannot be held responsible for errors. However, if you feel any material on this website is copyrighted or incorrect in any way please contact us using the link at the top of the page so we can remove it or negotiate copyright permission.
RLFANS.COM, the owners of this website, is not responsible for the content of its sub-sites or posts, please email the author of this sub-site or post if you feel you find an article offensive or of a choice nature that you disagree with.
Copyright 1999 - 2025 RLFANS.COM
You must be 18+ to gamble, for more information and for help with gambling issues see https://www.begambleaware.org/.
Please Support RLFANS.COM
|
|
POSTS | ONLINE | REGISTRATIONS | RECORD |
---|
19.67M | 375 | 80,283 | 14,103 |
| LOGIN HERE or REGISTER for more features!.
When you register you get access to the live match scores, live match chat and you can post in the discussions on the forums.
|
|
|